30%
FLAT OFF

On every SSB software product

Flat 30% discount on any software

School, hospital, hotel, restaurant, HR, lab, pharma and the rest of our software. Ask for a quote and we apply 30% on the price. Write to info@ssbconsultancy.com.

Design

Screens designed before anyone watched the user

Design that starts from a moodboard produces a product people admire and avoid. The work is to watch the task: where they stop, what they ask a colleague, and which field they leave blank.

Setup
1–3 weeks before build
Who it is for
Teams about to build or stuck after a build
Industry
Design
Product
UI and UX

The problem on the ground

The usual brief is “make it modern”. The current screen is ugly and also confusing, and only the second problem costs money. Staff keep a paper note because the software asks for twelve fields before it asks for the one they came to enter.

We sit on one task. We remove what that task does not need. You click a prototype. If you get lost, we change the prototype, not a finished build.

Visual design follows the path. Colour and type are part of the job. They are not a substitute for being able to finish.

See the product

What changes when this is live

The path
One task

From open to done, including the mistake people make

A click
Prototype

You try it before engineering spends a month

Fewer
Fields

What is not needed for the task is not on the screen

Handoff
To build

The screens match a flow engineering can estimate

What keeps breaking

The screen collects everything the database knows and the user needed one field.

Labels use vendor words the staff do not use.

Errors appear after submit, with no hint about what to fix.

A redesign is approved from a still image nobody tried to use.

Engineering estimates a picture, then discovers the flow was never decided.

How the software closes it

One primary task is designed end to end before secondary tasks.

Labels use the words your staff already say.

A mistake is explained at the field.

You click the prototype with a real example. Approval means you finished the task.

The build estimate uses that flow, so the picture and the scope are the same thing.

How a setup actually runs

Day 1

Watch the task

The current screen, paper or chat. Where people stop is the brief.

Next

A shorter path

The fields the task needs. The rest are later or gone.

Then

You try it

A prototype with your example, not a slide.

Handoff

Build or stop

Engineering can quote it. If the path is still wrong, we do not build it yet.

Questions this industry asks

Is this only visual design?

No. Visual design is included. The part that matters first is whether someone can finish the task. A beautiful screen that needs a phone call to complete has failed.

Do you redesign our existing product?

Yes. Bring the screen people avoid. We start there, not from a new homepage.

Can design happen in parallel with a rush build?

Only for work that is already understood. For the confused task, building in parallel recreates the confusion in code. We would rather delay that part.

What do you deliver?

The flow, the prototype you tried, and the notes engineering needs. You should be able to reject it before a developer starts.

Want this flow on a call?

Tell us the operation that is breaking. We will walk that screen and send a written quote.

Chat with Us

We reply instantly

+91

Your message will be sent directly to our WhatsApp